Microwave Engineering Project
The current phase of the Microwave project is Exploratory. This page contains all the engineering documents relating to this phase of work. The output of this phase of the work will be a mission and vision statement that we will take into the next phase of the project: Requirements Analysis, where the requirements used to design and build the project will be identified and reviewed.
Home Page

SBMS Transverter Test Plan
MEP Air Interface revision 0.2 posted for review, 8 Dec 2008
MEP Conceptual Block Diagram initial draft for review, 2 Nov 2008
"The Problem Is Pointing" article from TAPR PSR Winter 2009, outlines the Direction Finding packet method of APRS station discovery
Transverter Tracker Transverters under study for possible prototyping 30 July 2008
Block Diagram from an earlier project, for comparison.
Antenna and Feed Study version 1 for review 19 July 2008
RF Safety Review
Link Analysis The Math
Link Discussion The Motivation

MEP Beamwidths for reference - version 2.0
Example Call Flow Diagram for reference

What Is A Room? A Room is Similar to a Channel. Version 1.0 posted 18 March 2008.
Use Cases Master document for use cases, features, and potential requirements.
Protocol Layers Overview Orientation to the Layers
User Experience Discussion 21 February 2008